RM Analyzer Help

Variant: Copy

An existing variant of construction schedule can be copied. All the loads, additional constraints and stages of the origin variant will be copied.

SettingDescription
Origin CS name Name of the variant, to be copied
Copy CS name Name of the new variant (max.16 char.)
Description An optional description of the variant (max 80 char.)